The official website of the City of London300 Dufferin Avenue519-661-CITY (2489)

Explanation of Your Water Bill


2019 Residential Water Bill Example

Water rates for residents in London are calculated based on the following: 

  • Wastewater Usage Charges (shown as m3)
  • Water Usage Charges (shown as m3)
  • Infrastructure Connection Charge

Residential Water Utility Bill Sample

2019

Water charge calculation

Billing for 14m3

First 7m3x 0= $0 (Water consumption used in the month - first tier)

Remaining 7m3 x $2.2506 = $15.75 (Water consumption used in the month- second tier)

Wastewater charge calculation

This calculation is based on water consumption

Therefore the wastewater charge would be for 14m3

First 7m3 x 0= $0 (Wastewater consumption used in the month - first tier)

Remaining 7m3 x $2.0003 = $14.00 (Water consumption used in the month - second tier)

Infrastructure Connection Charges

Water Connection Charge $15.80
Wastewater Connection Charge $13.39
Stormwater Charge $16.30
Fire Protection $1.62
Customer Assistance $0.25
Total $47.36

 

 

 

 

 

(Most residential customers have 16mm meter *)

Total Water Utility Charges

Water and Wastewater Usage Infrastructure Connection Charge Total
$15.75 + $14.00 = $29.75 $47.36

$77.11

* Residents who have the need for a larger meter, such as those who live in homes located in low pressure zones, are subject to a different rate.

 

 

Last modified: