Fanshawe Park Road and Highbury Ave Intersection 

Limits: 300-500m on all legs of intersection

 

Works Completed Fanshawe Park Rd E from McLean Dr to 300 m east of Highbury Ave N and Highbury Ave N from Killarney Rd to Blackwell Blvd widened to four lanes and urbanized with curbs, streetlights, and sidewalks. In addition, storm sewers, sanitary and water servicing was extended where required.
Duration of Project: Contractor has prepared road for winter and will return in 2013 to complete top asphalt.
Budget: 9 million
Consultant Contract Administrator: Delcan Corporation
City Project Manager:
Phone: 519-661-2500 ext. 2496

Traffic Status


Current Traffic Status: Open to traffic

Extra Information Links Compacting and binding course asphalt on Fanshawe
Planter medians being built on Highbury Ave Restoring commercial driveway and boulevard Pouring sidewalk Paving binder going down on Fanshawe Park Rd
Grading on Fanshawe Park Rd Maintenace hole to sanitary sewer on Fanshawe Park Rd Catch basin set backs on Highbury Ave installation of maintenance hole on Fanshawe Park Rd
construction on Highbury Ave backfill and compaction around maintenance hole on Highbury Ave installation of catch basin leads on Highbury Ave Backfilling storm sewer leads on HighburyAve south
Installation of storm sewer leads to new manhole on Highbury Ave Installation of manhole on Highbury Ave Capping an abandoned sewer pipe on Highbury Ave South installation of catch basins
installing sanitary sewer backfill sod laid on commercial property Installation of tactile strip along north-east and south-east quadrants
Installation of sub-drains on property side of Highbury Ave Concrete air test on sidewalk concrete being performed Pouring concrete sidewalks on Fanshawe Park Road pouring sidewalk on Highbury Ave North
preparing manhole fine grading Pouring footings for sound barrier on Highbury Ave Insulation being placed over watermain
Installation of 300mm watermain on Fanshawe Park Road Installing water line around utilities Adjusting manhole to grade on Fanshawe Park Road Drilling lead connections to storm sewers
Compaction of granular backfill on Highbury Ave New sod being placed behind sound barrier and temporary fencing being removed Anti-graffiti coating being applied to sound barrier wall Installation of panels in noise barrier on Fanshawe Park Road
Installation of sewer leads on Highbury Ave Placing trench box for sewer work on Highbury Ave Installation of electrical ducts Installing subdrain on Fanshawe Park Rd
Installing noise barrier wall on Fanshawe Park Rd Installing storm sewer on Fanshawe Park Rd installation of temporary traffic signals stripping and grubbing in preparation for road widening
installation of temporary fencing excavating for temporary widening fine grading in preparation of temporary asphalt temporary pavement widening

Page Last Updated: Thursday, December 13, 2012 04:49 PM