Print banner
Print Normal text size Larger text size Largest text size
PrintText Size
Search
Menu line

City of London SCADA and Instrumentation Standards

The City of London SCADA (Supervisory Control and Data Acquisition) and Instrumentation Standards documentation is provided as reference individuals and companies working on water, wastewater and pollution control projects that involve the City's SCADA system and associated equipment. The content includes specific standards and specifications for SCADA and related instrumentation, electrical, field identification of equipment, commissioning, documentation and training requirements.

Tender documents for water, wastewater and pollution control projects will specify the applicable standards including revision number. Contractors are responsible for informing the contact person listed in the tender package if standards presented here do not provide the required information.

Acrobat graphicTo view or print the information below, you will need software such as Adobe Acrobat Reader.Acrobat Reader is available free of charge by clicking this link or the graphic to the right.

Table of Contents

DESIGN STANDARDS
Volume 1
Automation Design
November 2005

AUTOMATION & CONTROL STANDARDS

Volume 2
Automation Standards V4.1
March 2009
PROGRAMMING STANDARDS
Volume 3
Automation Programming V4.1

March 2009

Supplementary Notes

Pre-selection of RPU Programmer:

When such a pre-selection applies the City of London will negotiate a fixed price in advance of tendering which will be carried by all bids.

Go to top